BAUER Nimr LLC, July 2017-July 2018, "Monitoring of the performance of a composting facility at the Nimr Water Treatment Plant in Oman", €8280.

DELTA AKSIOU ENERGEIAKI S.A.,  PI, Jan 2016-April 2016, "Estimation of the biochemical methane potential of three types of agricultural wastes and manures", €2100.

DIAAMATH (Solid Waste Association of the Region of Eastern Macedonia - Thrace), April 2014-September 2015, PI, "Laboratory characterization of home composting samples in the Region of Eastern Macedonia and Thrace", 33288€

RAM Europe S.A., June 2011-June 2012, PI, EVALUATING THE QUALITY OF COMPOST PRODUCED FROM A NOVEL COMPOSTING FACILITY IN KALAMATA-GREECE, 9000€

DIAAMATH (Solid Waste Association of the Region of Eastern Macedonia - Thrace), Feb 2010 - August 2011, PI, "MONITORING THE BIODEGRADATION OF SOLID WASTES STORED IN WRAPPED BALES IN THE ISLAND OF THASSOS" Total budget: 6999€

MESOGIOS S.A. and MESOGIOS ENVIRONMENTAL SERVICES S.A., April 2010- Feb 2013, PI, "MONITORING THE PERFORMANCE OF A MSW BIODRYING FACILITY (CRETE) AND A MSW COMPOSTING FACILITY (KEFALONIA)"  Total budget: 45152€.


Participant 

General Secretariat of Research and Technology Participant, During this project, I was responsible for the setting up of experiments with air tight aerobic reactors to investigate the co-composting of dewatered wastewater sludge with the organic fraction of municipal solid wastes. Mass balances of carbon and nitrogen were performed. INTEGRATED MANAGEMENT OF WASTEWATER AND WASTEWATER SLUDGE USING NATURAL TREATMENT SYSTEMS

EU Regional Development Directorate-General Participant: During this project, I was responsible for designing treatment facilities for two remote olive mill plants in the island of Lesvos. In addition, I was involved with the economics of olive mill wastewater management in central and decentralized level in the island of Lesvos. Innovative Olive Mill Waste Management Systems (NAIAS Project) Approx. 800.000€ for the whole project (other tasks were involved).

Prefecture of Kozani Participant: Developed a methodology to assess the maximum number of tourists in a cave near Ptolemais to avoid deterioration of the carbonate rock formations (stalagmites etc.). Included measurements of CO2 contents within the cave, measurements of [Ca++] in the cave water and measurements of aeration rates through the cave. Environmental Impacts of Tourism on Ermakia Cave of the Kozani prefecture 5000€

Prefecture of Chios Participant: Developed a methodology to assess the maximum number of tourists in a cave (Olimpi village) to avoid deterioration of the carbonate rock formations. As mentioned in previous section. Measurement of Environmental Parameters for an Environmental Impact Study of Sykia Cave, Municipality of Mastihihoria, Perfecture of Chios 5000€

Environmental Committee of the Municipality of Neapoli, Aitoloakarnania Participant: Developed siting criteria to re-assess a site in Aitoloakarnania (Western Greece) as a proposed new landfill site within the prefecture. Evaluating a site as a proposed landfill site in the Municipality of Neapoli in Agrinio - Western Greece 6000€

* Funding provided by the Dept. of Environmental Engineering.


Dept. of Environmental Engineering, Democritus University of Thrace
Υλοποιήθηκε από τη Webnode Cookies
Δημιουργήστε δωρεάν ιστοσελίδα! Αυτή η ιστοσελίδα δημιουργήθηκε με τη Webnode. Δημιουργήστε τη δική σας δωρεάν σήμερα! Ξεκινήστε